Central Plant Controller
and Web Monitoring

The Central Plant Controller is the device required by grid regulations to govern the power fed into the grid. SunGuard supplies it, installs it and integrates it into monitoring: a node visible on the platform, not a standalone object.

Grid

The certified interface between the plant and the grid operator.

CCI SunGuard Energy — Controllore Centrale d’Impianto

Device

Central Plant Controller

The CCI is the certified interface between the PV plant and the grid operator. It receives commands to reduce the power fed into the grid — dispatching — from GSE or the local distributor, transmits them to the plant and certifies their execution.

It is a mandatory requirement for plants under scheduled dispatching and for those subject to the limitations of the TERNA Grid Code.

Regulatory obligation

Prescribed by TERNA, CEI 0-16 and the ARERA resolutions.

In Italy, installation of the CCI is required by the CEI 0-16 Standard and the ARERA resolutions (540/2021, 730/2022, 385/2025): observability and controllability for MV plants above threshold, with financial contributions for upgrading existing plants between 100 kW and 1 MW.

Failure to install or malfunction may lead to the suspension of incentives or disconnection from the grid. Details on deadlines, contributions and specifications are in the Insights section just below.

Insights

Regulations, contributions, features and specifications.

Regulatory framework, incentives for upgrading and technical data sheet of the CCI SunGuard Energy: Central Plant Controller with integrated PowerMeter and optional Power Quality, compliant with CEI 0-16 and the ARERA resolutions.

Reference regulations

The CCI is the instrument envisaged by Italian regulations for the observability and controllability of generation plants connected at medium voltage. The CCI SunGuard Energy is designed in compliance with the CEI / ARERA framework set out below.

Regulatory framework

  • CEI 0-16 Ed. 03/2022 — Reference technical rule for the connection of active and passive users to the MV and HV networks of distribution companies; Annexes O and T for the Central Plant Controller.
  • ARERA 540/2021/R/eel (30 November 2021) — Governs data exchange between TSO, DSO and Significant Grid User (SGU): generation ≥ 1 MW in MV and withdrawals ≥ 10 MW on the transmission network. Official ARERA text
  • ARERA 730/2022/R/eel (27 December 2022) — Amends the CCI installation timelines set out in 540/2021. Official ARERA text
  • ARERA 385/2025/R/eel (8 August 2025) — Extends the CCI installation obligations and PF2 functionality to plants ≥ 100 kW, with financial contributions for upgrading existing plants. ARERA fact sheet · PDF

Observability and controllability

Under resolutions 540/2021 and 730/2022, generation plants ≥ 1 MW must install a CCI compliant with CEI 0-16. Resolution 385/2025 extends the obligation to plants ≥ 100 kW (new and existing) and provides contributions for upgrading intermediate sizes.

PF2 functionality — active power limitation on DSO command

New plants ≥ 100 kW Immediate requirement for a CCI with PF2 active for connection purposes.
Existing ≥ 1 MW Upgrade (CCI + PF2) and notification to the DSO by 28/02/2026.
Existing ≥ 500 kW and < 1 MW Upgrade by 28/02/2027.
Existing ≥ 100 kW and < 500 kW Upgrade by 31/03/2027.

Existing and new plants

The distinction between an existing and a new plant follows the connection request and commissioning (COD) dates indicated in resolution 385/2025/R/eel (and subsequent amendments). Always verify the classification with the relevant distributor before planning the upgrade.

CEI 0-16 Ed. 03/2022 CEI EN 61000-4-30 ed. 3 (Class A) CEI EN 61010-1 ARERA 540/2021/R/eel ARERA 730/2022/R/eel ARERA 385/2025/R/eel RSE 12004159 EN 62053-22 Class 0.2S EN 62586-1 (PQI-A-FI1-H) IEC 60870-5-104 IEC 61850

The regulatory references indicate the product's compliance; specific deadlines and obligations for the individual plant must always be verified with the relevant distributor and against the official ARERA text.

Wiring diagram

How it integrates into the infrastructure.

Rete elettrica Impianto FV MONITORAGGIO CCI Controllore Centrale di Impianto A B C CONTROLLO e MONITORAGGIO SunGuard Energy Datalogger Cloud SunGuard Energy COMUNICAZIONE DSO Distribution System Operators Internet Altri soggetti
Measurement and communication SunGuard Energy control and monitoring

The service

A single point of contact, from supply to oversight.

SunGuard manages the entire CCI lifecycle: supply of the certified device, installation and commissioning, native integration into the SGE platform, continuous operation checks and updates for regulatory changes. Status, dispatching events and plant responses remain visible in real time and feed into the periodic reports.

Certified supply

We select and supply CEI 0-16 certified CCI devices, in compliance with TERNA requirements and the regulatory regime applicable to the plant.

Installation and commissioning

The technical team handles the entire deployment process: from planning to configuration, through to functional field testing.

Integration and monitoring

The CCI is a node of the SGE platform: status, dispatching events and plant responses visible in real time and included in the reports.

Class A network analyzer

The CCI SunGuard integrates a Class A certified power quality analyzer. No separate meter is needed: lower installation cost, maximum accuracy from day one.

Heterogeneous plants

The SGE datalogger unifies the inverter fleet towards the CCI.

Multi-brand

A single interface, whatever the fleet.

In a real plant, inverters come from different brands and generations: different protocols, proprietary adapters, complexity that would fall on the CCI. With the SGE datalogger, the CCI talks to a single standardized interface. SunGuard translates commands and telemetry to each inverter — regardless of brand — and returns consolidated data.

Setpoint

Power curtailment, coordinated across the entire fleet.

When the CCI sends a curtailment command, the datalogger converts it and distributes it in a coordinated way to all the inverters, whatever protocol each one uses.

Data

Consolidated measurements, without breaking the monitoring.

The datalogger returns consistent measurements to the CCI: a single view of the plant. The dispatching ordered by the DSO enters the platform's information base — unproduced energy, impact on KPIs, deviation from the plan — and enriches reporting and operational analysis.

Next steps

Compliance assessment and certified supply.

The CCI SunGuard Energy is Class A and compliant with the CEI/ARERA framework. SunGuard manages supply, installation, platform integration and continuous operation checks.

Firmware, manuals and drivers are available in the area reserved for installers. The SGE datalogger natively integrates with the CCI SunGuard Energy.